Apply for plan review for hazardous materials handling facilities
Plan review process
Please review the plan submittal requirements for hazardous materials systems
For underground storage tank installation, upgrading or retrofitting
If your project involves an underground storage tank system, you must submit a Hazardous Materials Construction Permit Application (form HMCD-116) and a completed Equipment List for Underground Storage Tank Systems (form HMCD-024U) along with other information specified in the permit application form.
For aboveground storage tanks and hazardous materials storage facility construction
If you are installing, retrofitting, or upgrading an aboveground storage tank used to store a hazardous material, you must submit a Hazardous Materials Construction Permit Application (form HMCD-116) and a completed Equipment List for Aboveground Storage Tank Systems (form HMCD-024A) along with other information specified in the permit application form.
If you are installing, retrofitting, or upgrading a hazardous materials storage system/area, you must submit a Hazardous Materials Construction Permit Application (form HMCD-116) along with other information specified in the plan submittal requirements guidance document.
Toxic gas systems
If your project involves a toxic gas system, you must submit a Hazardous Materials Construction Permit Application (form HMCD-116) and a Toxic Gas Installation Application (form HMCD-019) along with other information specified in the plan submittal requirements guidance document.
Review of complex projects may take a bit longer, but our goal is to complete plan review and either issue approval or provide details regarding deficiencies within 10 working days of receiving all of the information that makes up a complete submittal. If information is missing or the plan review fee is not paid, your project will remain in our Service Request intake process and will not be reviewed until you provide the missing pieces. If you carefully review the submittal instructions and provide all required information, you will help avoid unnecessary delays.
Please note that additional plan check reviews and approvals may be required from other agencies such as the Fire authority having jurisdiction (AHJ) for Fire Code compliance, the local building authority (i.e., County Office of Development Services or City Building Department), Bay Area Air Quality Management District (BAAQMD), etc.
Submittal
Please e-mail all completed Hazardous Materials Applications for Underground/Aboveground Storage Tanks (UST/AST systems) and all supporting documentation to: [email protected]. All electronic submittals are preliminary reviewed for completeness, file format, before an invoice is sent to the applicant for the appropriate plan review fee. Please note that projects do not enter the queue for review and approval until these steps are completed and all invoice fees are paid.
All electronic submittal files must be in PDF format.
- Plan Submittal Requirements for Hazardous Materials Systems
- Aboveground Motor Vehicle Fuel Tank System Installation Guidelines
- Communications Site Requirements
- Guidelines for Installation of Temporary & Permanent Aboveground Diesel Fuel Tanks for Emergency and Standby Power Systems Located Outside of Buildings
- Marking Requirements and Guidelines for Hazardous Materials & Hazardous Wastes
- Underground Storage Tank Lining Requirements
- Underground Storage Tank Monitoring System Cold Starts
- Underground Storage Tank System Installation, Repair, and Upgrade Permit Requirements